Place it
- On the job's Map, tap Add tree.
- Stand at the trunk and tap Here, by GNSS. Keep still while TreePin averages the fix; it saves with its accuracy, such as ±2.4 m.
- Or tap Tap the map, then tap where the tree is.
If the accuracy is over your limit, TreePin shows a warning so you can wait for a better fix or step into open sky. See GNSS accuracy, datums and zones.
Fill it in
The tree sheet opens with the tree's number. Fill in species, DSH (each stem of a multi-stem tree), DAB, height, canopy and condition. The header counts what your form still needs, marked REQ, and jumps to the next one.
As soon as the DSH and DAB are in, the plan view draws the NRZ dashed and the SRZ hatched, to scale. Set retain, retain with conditions or remove when you're ready; the pin on the map shows it by shape and colour.
Photos
- On the tree sheet, tap Take photo. Each photo keeps the time and the place it was taken.
- Open a photo to set its type: Observation (what the tree shows now) or Recommendation (work or care it needs), and add a caption.
- Tap Mark up photo to add an arrow, a line or a label. The original photo is never changed.
Rapid mode for big audits
In Add tree, turn on Rapid mode. Each tree then shows the fewest fields, and Save and next starts the next tree the same way. Open the full tree sheet any time for the rest.