APP SCREEN TO COME
Start the job
- On Jobs, tap New job.
- Under Site, give the site a name and its address. Under Job, add the client and anything else your form asks for.
- Under Tree form, pick the form for this job. The job keeps this version, even if you change the form later.
- Tap Start job. The job opens on its map.
On site
- Before you lose signal, save the site's maps: see Save a site before you lose signal.
- Tap Start survey. The clock and the walk start, and the live stats show trees, time on site and trees an hour.
- Tap Add tree for each tree: see Capture a tree and its photos.
- When the last tree is done, tap Finish, then Finish survey.
The summary
The survey opens as a story of cards: the map, trees, time on site, trees an hour and decisions. Share card sends a picture of it with no site name, address, client, tree numbers or coordinates on it.